Photovoltaic Power Generation System Flow Until Implementation

Consultation

image

First, we call on you to listen carefully to your needs and wants

Arrow

 

Field study

image

Based on the consultation, we conduct a field study of the desired installation location

Arrow

 

Proposal

image

We formulate a plan optimized for your objectives, and draw up a proposal

  • Optimal system construction proposal
  • Run power output simulation
  • Calculate approximate costs

Arrow

 

Determine Specifics

image

We agree upon proposal details and sign a contract

Arrow

 

System Construction

image

We start building the system, following the contract details

Arrow

 

Equipment Production, Construction and Installation

image

We produce, build and install equipment along with system construction

  • Thorough quality control
  • Thorough delivery date management
  • Thorough safety control

Arrow

 

Operation and Maintenance

image

We deliver the system after checking functionality and making trial runs to ensure proper system operation

  • Thorough preventative maintenance with a maintenance plan
*
This flow excludes public projects.

Photovoltaic Power Generation System Implementation Schedule (Sample) : 5MW

Example 10-month schedule from commencing design until completing commissioning