Skip to main content

HITACHI REVIEW

Hitachi

Authors

Katsumi Fushiki
Nuclear Plant Dept., Hitachi-GE Nuclear Energy, Ltd.

Takashi Inoue
Nuclear Plant Dept., Hitachi-GE Nuclear Energy, Ltd.

Koichi Murayama
Nuclear Plant Dept., Hitachi-GE Nuclear Energy, Ltd.

Overview

Hitachi-GE Nuclear Energy, Ltd. has developed and improved construction technology for advanced boiling water reactors based on extensive experience in boiling water reactor construction. Shimane Nuclear Power Station Unit No. 3, which is being supplied to The Chugoku Electric Power Co., Inc., is now under construction using HGNE's latest construction technology. In particular, HGNE applies a "room module" for HCUs. This room module is composed of building structures such as walls, the ceiling, floor, and almost all mechanical components inside the room such as piping, platform, and cable trays. Once the room module is installed at a site, the work is almost completed. Therefore, the amount of work at a site can be significantly reduced, which helps to distribute the work evenly. HGNE collaborates with Kajima Corporation to design and ssemble the HCU room modules.

Contact for Inquiry

Nuclear Plant Department, Plant Construction Section, Hitachi Works, Hitachi-GE Nuclear Energy,Ltd.

TEL: +81-294-55-4828
FAX: +81-294-55-9910

Keywords

nuclear, module, HCU, construction, ABWR

Download Adobe Reader
Adobe® Reader® of Adobe Systems Incorporated (Adobe Systems) is required to view PDF documents.