To solve the shortage of water supply capacity of an existing drinking water treatment plant (125,000 m³/day) caused by population increases, we installed flocculation tanks, sedimentation tanks, rapid filtration tanks, and chemical dosing facilities, which increased the water supply capacity to 250,000 m³/day.
| Facility | Drinking water treatment plant |
|---|---|
| Capacity | 125,000m³/day |

Overview of water treatment plant

Flocculation tank

Sedimentation tank

Rapid filtration tank

Central monitoring room
To solve the shortage of water supply capacity of an existing drinking water treatment plant (35,000 m³/day) caused by population increases, we installed flocculation tanks, sedimentation tanks, rapid filtration tanks, and chlorine dosing facilities, which increased the water supply capacity to 70,000 m³/day.
| Facility | Drinking water treatment plant |
|---|---|
| Capacity | 35,000m³/day |

Overview of water treatment plant

Rapid filtration tank

Sludge thickening tank

11kV receiving board

Low-voltage distribution board