Featured customer case

Lumada customer case code: UC-01940S

Using images and animations to explain the changes resulting from urban projects, and ensuring road projects proceed steadily with the participation of residents (2/2)

—TRAFFICSS: A traffic flow simulator supporting road projects and urban development—

2023-09-20

Trialing road projects and urban development in cyberspace

TRAFFICS: The traffic flow simulator

TRAFFICSS can simulate, in cyberspace, various traffic‑related events and conditions on roads and enables stakeholders to evaluate various proposals visually and quantitatively.

High‑precision simulations that reflect detailed events or conditions

TRAFFICSS simulations utilize digital twins, which accurately represent real‑world traffic flows using data such as the results of traffic volume surveys.
Project planners can conduct simulations under various conditions for which it is difficult to conduct experiments on actual roads. For example, TRAFFICSS allows planners to change traffic‑signal times or to examine multi‑layered intersections.

In addition, TRAFFICSS supports traffic conditions that are common overseas, such as roundabouts and right‑hand traffic. Therefore, planners can conduct simulations of roads other than those in Japan. Planners can set detailed events and conditions (such as the behavior of individual vehicles, pedestrian behavior, whether there is on‑street parking, and buses at bus stops) and conduct simulations to check the impact on traffic flows. This process produces highly accurate results.

Planners can repeatedly conduct simulations under a wide variety of conditions and compare the results, resulting in an optimal project plan that provides the highest benefits.

Visual representations of simulation results in 2D, 3D, and 3D VR animations

Project planners can express the results of simulations quantitatively, in numerical values and graphs. In addition, the planners can apply the results onto paid and free maps, and can express the results visually in 2D and 3D animations.

In 2D animations, TRAFFICSS users can apply simulation results onto frequently used maps such as Google Earth and maps of the Geospatial Information Authority of Japan, and can check how objects such as cars move.
In 3D animations, TRAFFICSS users can apply simulation results onto 3D maps provided by ZENRIN CO., LTD. and PLATEAU*, etc. The users can express cityscapes including buildings around roads three‑dimensionally, and viewers can check traffic flows from a viewpoint that looks down from a high place. In addition, by combining the results with VR (virtual reality) technology, viewers can see the future streets and neighborhood after the project is complete from the perspective of a car driver who is actually driving on the street or a pedestrian walking in the neighborhood.

Animations enable viewers to understand the traffic flow as if they were actually in the neighborhood after the project is finished, which makes the situation easier for them to understand. The resulting presentation materials are effective in meetings among related parties and in explanations to residents.

*
Japan’s Ministry of Land, Infrastructure, Transport and Tourism (MLIT) is leading a project to develop and utilize 3D urban models nationwide in Japan and to convert them into open data.

Automatically measuring traffic volumes by linking with TRACOLRE (Hitachi’s traffic counter using video data)

TRAFFICSS can improve the accuracy of measurement data used for simulations by linking with TRACOLRE, a solution that automatically measures traffic volume from video data.

When considering a project plan, planners usually conduct a traffic volume survey to understand the current situation related to the roads. Such traffic surveys are usually conducted manually, which results in the following problems:

  • Long working hours of investigators
  • An insufficient number of investigators
  • Variations in measurement results

To resolve such problems, Hitachi provides TRACOLRE, which can automatically measure traffic volume and traffic flows. By using TRACOLRE’s image recognition technology to detect vehicles in actual video footage of roads and then analyzing the vehicle sizes, number, speeds, paths, etc. over time, planners can understand the current situation more accurately.
TRACOLRE eliminates the problems of manual traffic surveys and enables highly accurate simulations. In addition, it shortens the time from understanding the current situation to conducting simulations.

Example of applying the solutions

Next, we will describe an actual example of using the described solutions to implement a new public transportation system in Utsunomiya City, which is in Japan’s Tochigi Prefecture. The project is constructing a next‑generation streetcar system called LRT (Light Rail Transit).

In Utsunomiya City, the percentage of people who use cars for transport is high; however, the percentage of people who cannot drive a car is increasing as the population ages. For Utsunomiya to be a city where it is easy to live, the city needs good public transport.
Therefore, Utsunomiya City decided to introduce LRT as their next‑generation streetcar system. This new public transport system will join the existing train and bus systems.

Issues
Like trams, LRT vehicles run on dedicated rails built beside vehicular roads. Therefore, after LRT is introduced, LRT carriages and cars will intersect at intersections, and traffic lights for cars, pedestrians, and LRT carriages will be mixed.
Familiar roads will change greatly for local residents, but it was difficult for them to imagine where and how LRT vehicles will run, and planners expected confusion due to changes in traffic rules.
Measures to resolve the issues
Utilizing TRAFFICSS simulation technology, project planners showed (in cyberspace) how road conditions will change after the introduction of LRT. The planners also used VR technology that allows stakeholders to check the simulation results from the driver’s point of view and used such materials to explain the project to the residents.
As a result, stakeholders (including residents) could gain a concrete image of traffic flows after the introduction of LRT, and the residents became more confident regarding their understanding of the effects and benefits of LRT introduction.

Outlook for the future

Our goal is to ensure the wide use of TRAFFICSS not only in road business but also in the formulation of project plans and construction plans in various industries.
For example, in the real estate construction business, TRAFFICSS will contribute to urban development by enabling the participation of residents, and by ensuring that the impact of facility construction on surrounding roads is taken into account.

When a large shopping center or a large‑scale logistics center is built, traffic congestion in the surrounding roads can be expected because, after construction, a large number of people and cars will be concentrated in one place. Using TRAFFICSS, project planners can simulate the traffic flow after the construction of the facility and formulate a construction plan that incorporates measures to alleviate traffic congestion. Furthermore, planners can perform re‑simulations that reflect the requests of local residents, and incorporate the results in the construction plan.
These solutions make it possible to promote real estate construction projects in which residents participate and which take into account the impact on surrounding roads. In addition, by simulating not only the traffic flow after the facility is constructed, but also the impact of the increase in the number of construction vehicles during construction, planners can reduce the entire project’s impact on surrounding roads.
Alleviating traffic congestion not only improves the environment by reducing the amount of exhaust gas, but also has a positive impact on the flow of goods and materials, which will increase economic benefits in the region.

For details on our solutions, see the following webpages.

Traffic Simulation System
This solution enables detailed simulations of traffic conditions and enables quantitative and visual evaluations of the simulated traffic scenarios.
This solution is provided in Japan.
Hitachi Image Traffic Counter
This solution makes traffic surveys easier and more accurate. The automated measurements improve measurement accuracy.
This solution is provided in Japan.
Transport Future City Utsunomiya Open Square
For more information, please visit the Haga‑Utsunomiya LRT official website.

Summary

Generating images of the future in cyberspace and evaluating proposals visually and quantitatively
Utilizing Hitachi’s simulation technology, project planners can use animations to show images of the future situation after an urban development or road project is complete. By visually explaining the project’s benefits, the planners can promote understanding of a project among local residents and the project can proceed steadily based on the agreement of both business operators and local residents.
TRAFFICSS: The traffic flow simulator
The TRAFFICSS simulator can express various traffic events and conditions on roads in cyberspace, so stakeholders can evaluate simulated traffic scenarios visually and quantitatively. With high‑precision simulations and animations of the results, TRAFFICSS supports the formulation of highly effective project plans and provides the materials for easy‑to‑understand presentations. In addition, TRAFFICSS can be linked with TRACOLRE, which can measure traffic flows automatically.
Does your business generate a large amount of data that remains unutilized?
Are there worksites that generate data every day, such as worksites related to road projects and urban development?
You can unlock the true potential of your data and create new value through data collection and analysis.

Key points of this article

  • Planners can explain the benefits of a road project both quantitatively and visually and can thereby gain the understanding and approval of local residents.
  • Planners can create a project plan that incorporates the requests of local residents and the work can progress as a participatory project with residents.
  • Few complaints are received after the start of construction, and the project can proceed and construction can finish on schedule.

For example:

The real‑estate construction business can also utilize the technology that uses digital twins to perform simulations in cyberspace.
For the construction of a large‑scale facility where many people and vehicles gather, project planners can use this technology to simulate traffic conditions such as congestion and to explain the situation to local residents. By incorporating opinions and requests for desired changes, planners can ensure the project advances smoothly with the participation of residents while reducing the adverse impact on surrounding roads.
In addition, eliminating traffic congestion has a positive impact not only on the natural environment but also on the movement of goods and materials, so stakeholders can expect increased economic benefits in the region.

*