Matsui: After joining Hitachi, you got involved in safety assessment, so you must have been working on the front lines of the industry when the accident at the Fukushima Daiichi Nuclear Power Station occurred.
Hisamochi: Although I was not at the site, I assessed the status of the plant, working with the Government-TEPCO Unified Response Headquarters that took charge of accident response at the head office of the Tokyo Electric Power Company (TEPCO). On the day of the accident, March 11, I was at the Japan Nuclear Safety Institute near Tamachi Station. We were having a meeting in the afternoon when the earthquake occurred. I had an overseas business trip scheduled after that, so I went to Keisei Ueno Station on foot and waited there. It was difficult to get through to anyone over the phone. When I managed to get through to the office in the evening, I was told to give TEPCO help because they were in serious trouble. I still remember it was very hard to go anywhere. In the company building itself, for instance, the elevators were out of service and we had to walk everywhere, up and down t he stairs to the emergency response unit on the 29th floor.
Matsui: On the day, we, the press, gathered at TEPCO's head office. I experienced the seriousness of the situation gradually becoming clear in real time. You must have felt a considerable sense of crisis as you came into contact with information on the front lines of the response to the accident.
Hisamochi: As I mentioned earlier, I was working on severe accident countermeasures at the time. A severe accident is a situation where the core of reactor is significantly damaged. This was exactly what was happening at that time. In fact, I had helped develop the procedures for responding to a core meltdown together with TEPCO, so I had all the necessary steps in mind and was able to explain what needed to be done.
However, it was frustrating that we could not get all the information from the site. I was anxious—wondering if the data we couldn’t see might point to a more serious situation. At the same time, I held on to hope, thinking, “We’ll do everything we can with the data we do have,” and “There are still options.” Deep down, I was prepared for this to be my final role in the nuclear energy field, but I never gave up hope and tackled the situation with a determination to contribute all the knowledge I had as an engineer.
Matsui: We also felt strongly that we had to report the facts and avoid any misinformation. However, in some cases, even if data was disclosed properly, it was learned the data was wrong due to malfunctioning equipment. You were also in a difficult situation. You must have been young at that time.
Hisamochi: I was in my early 40s.
Matsui: To have calmly handled such a major accident at that age shows great strength of character. Knowing that someone like you is now leading Hitachi’s nuclear energy business is reassuring—even though we must do everything to prevent another accident. Were you involved in the response efforts for some time afterward?
Hisamochi: Yes, I provided technical support for reactor core cooling for about six months. At the same time, I discussed safety measures with TEPCO in a way that could be applied in the current nuclear power plants that incorporated lessons from the accident. As someone responsible for plant safety, I was committed to doing everything I could.