- Developed fully automatic washing machine
- Completed experimental nuclear reactor
|
- Developed exothermic self-hardening mold
|
- Completed 265,000-kW impulse reheating cross-compound turbine
|
- Completed the first cars for the Shinkansen (Bullet Train)
- Manufactured monorail running between Haneda Airport and Hamamatsu-cho, Tokyo
|
- Completed HITAC 5020 system
- Completed 19-inch 90° polarized color cathode ray tube using rare earth fluorescent elements
|
- Developed LTP processing technique for silicon transistors
|
- Developed dry-type room air conditioner
|
- Developed hybrid LSI
- Completed HIDIC 100 electronic computer for control applications
- Developed 300-m/min elevators for high-rise buildings
|
- Completed on-line banking system
- Developed and mass-produced all-transistor color televisions
- Developed Lo-D 2-Way speaker system
|

*figure5
- Developed computer-aided traffic control system for the Shinkansen (Bullet Train) *figure5
|
- Completed large (1 Gbyte) file storage unit
|
- Developed new-type image pickup tube
|

*figure6
- Developed numerically controlled ruling engine for aplanatic concave diffraction grating
- Commercial operation began at Japan's first 460,000-kW nuclear power station *figure6
- Successful automation of semiconductor assembly (automation of wire bonding for LSIs and transistors)
|

*figure7
- Developed high-performance heat transfer surface (Thermoexcell)
- Developed Hitachi High Crown Control Mill
- Completed large M-series computer system *figure7
|
- Succeeded in trial of world's first optical transmission system
|
- Developed high-speed amino acid analysis machine (type 837)
- Completed construction of Fugen advanced thermal converter reactor
|
- Completed world's first field emission electron microscope with record-high resolution
- Experimental color camera with solid-state miniature image device developed
|
- Completed HITAC M-series 200H
|
- Completed 300-MW AC/DC converter for electricity link between Hokkaido and Honshu
|